A New Income-Generating Residence by Standard One
Build-to-rent apartments delivered fully finished
Get a consultation
Kyiv, Pozniaky metro station
A New Income-Generating Residence
by Standard One
Build-to-rent apartments delivered fully finished
Get a consultation
Kyiv, Pozniaky metro station
S1 POZNIAKY IS:
The next generation of income-generating residences by Standard One — every apartment is delivered fully finished.
Extensive on-site amenities: a shelter, co-working space and lounge area for residents, a cinema room, game room, karaoke room, children’s playroom, kitchen & event space, gym, café, and restaurants.
Hotel-grade services: cleaning, 24/7 security, laundry, and concierge service.
Highly liquid real estate: easy to rent out and quick to resell.
A retail center on the ground floors: supermarkets, cafés, restaurants, a dental clinic, shops, and pharmacies.
Advantages
See what your apartment could look like
Complex location
Complex location
Kyiv,
Pozniaky
S1 Pozniaky occupies a prime location — steps from the metro and surrounded by green leisure areas.
Інфраструктура
Супермаркети
Метро
Ресторани
Паркінг
Банкомати
Building Amenities
Live and work in one place
Lobby
A modern two-story lobby spanning approximately 500 sq.m, featuring a spacious co-working area, a lounge zone, and a cinema screening area. Everything residents need to work, relax, and socialize — all under one roof.
Co-Working Space
The co-working space at Standard One is more than just a place to work. It’s an environment designed to inspire and boost productivity. Find a quiet spot to focus and work in a setting that blends comfort with efficiency.
Lounge Area
The lounge at Standard One is a space for relaxation and connection. An ideal setting for meeting friends, reading, or simply enjoying some quiet time. Experience the feel of an exclusive club — without leaving home.
Every apartment comes with a White Box finish, a completed bathroom, and a fitted kitchen
Investors save time and money on renovation — and tenants never have to wake up to the sound of a drill.
S1 Pozniaky Apartment Layouts
Construction technology:
monolithic reinforced concrete frame
Ceiling height: 2.7 m
Wall material: brick

Heating: private boiler house Energy-efficient construction technologies
Special Offer: 0% Interest-Free Installment Plan
Specifications
0,46 Ha
Land plot area
756
Total apartments
24
Floors
29 500 sq.m
Total apartment area
1,500 sq.m
On-site amenities
7000 sq.m
Commercial space
Construction Progress
We report on every month of progress
February 2026
Pile field installation is in its final stages. Soil preparation ahead of pile cap work has been carried out, and pile cap installation for the high-rise section has begun. Supporting technical processes are now underway: backfilling with layer-by-layer compaction, waterproofing beneath vertical structures, and lightning protection installation within the reinforced concrete pile cap structures.
January 2026
The tower crane has been fully assembled and is now operational on site. Pile field installation has reached 65%. The access ramp has been dismantled and the site has entered the active construction phase. Preparation for the high-rise section’s pile caps is underway, with initial installation work completed. Rebar cage fabrication is progressing in parallel.
December 2025
Foundation pit excavation has been fully completed. Perimeter fencing and trial pile dismantling are finished in full. The tower crane foundation is complete. Active pile field installation continues — currently at 45% completion. Tower crane assembly is nearly finished at 95%. Concrete preparation for pile caps has begun.
November 2025
As of November, soil excavation to the design elevation with off-site removal is 95% complete. Lagging installation around the pit perimeter stands at 85%. The tower crane foundation is 90% ready. Pile field installation has commenced (2%), trial pile clusters have been dismantled, and preparation for the main pile field is underway (15%).
Sheet pile fencing has been installed. The binding beam is in place. Relocation of water supply and sewage networks has been completed. Excavation of the foundation pit is 30% complete.
OCTOBER 2025
Documentation
In accordance with the Law of Ukraine “On Regulation of Urban Planning Activities” and the Resolution of the Cabinet of Ministers of Ukraine “On Implementation of the Pilot Project for the First Phase of the Unified State Electronic System in Construction,” all construction permits and approvals are published on the Portal of the Unified State Electronic System in Construction.
Get in Touch
Leave your contact details
and we’ll reach out to you
Дякуємо за звернення
Ми зв’яжемось з вами в найближчий час
Oops! Something went wrong while submitting the form.